bea
Active Member
Hi,
it seems, that I'm out of Fabrik....
I need to calculate the order of records with same date and same shift, because I need it to get the right data from another database. There will be always 3 records within a shift and they should numbered like 1,2,3.
I've no idea how to write the calc ...
Cheers,
Bianka
Elements:
$shift = $data['fab_cp1_line_tour___shift_raw'];
$date = $data['fab_cp1_line_tour___date_raw'];
$id = $data['fab_cp1_line_tour___id_raw'];
it seems, that I'm out of Fabrik....
I need to calculate the order of records with same date and same shift, because I need it to get the right data from another database. There will be always 3 records within a shift and they should numbered like 1,2,3.
I've no idea how to write the calc ...
Cheers,
Bianka
Elements:
$shift = $data['fab_cp1_line_tour___shift_raw'];
$date = $data['fab_cp1_line_tour___date_raw'];
$id = $data['fab_cp1_line_tour___id_raw'];